20170718_091032.jpg
       
     
NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI
       
     
CROSS COUNTRY PIPELINES FOR TODD ENERGY MANGAHEWA G TIKORANGI
       
     
NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI
       
     
Nova Energy Power Plant Site
       
     
Envirotanks
       
     
Kapuni Stream Raw Water intake for Hawera
       
     
Faull Farms
       
     
Lower Kohuratahi Suspension Bridge Conservation
       
     
Stock Underpass
       
     
Bridge to Somewhere
       
     
Underwater Depot Retaining Wall
       
     
Underwater Depot Retaining Wall
       
     
Wills Road Subdivisions
       
     
Storm Damage Repairs
       
     
Ahuroa Road Culvert Replacement - Stratford District
       
     
2015 Storm Damage Slip Repair - Junction Road Stratford District
       
     
2015 Storm Damage Slip Repair - Junction Road Stratford District
       
     
20170718_091032.jpg
       
     
NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI
       
     
NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI

Geotechnical investigations 2017

CROSS COUNTRY PIPELINES FOR TODD ENERGY MANGAHEWA G TIKORANGI
       
     
CROSS COUNTRY PIPELINES FOR TODD ENERGY MANGAHEWA G TIKORANGI

Geotechnical investigations 2017

NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI
       
     
NEW TANK FLARE FOR TODD ENERGY MCKEE PRODUCTION STATION TIKORANGI

Geotechnical investigations 2017

Nova Energy Power Plant Site
       
     
Nova Energy Power Plant Site

Nova Energy Power Plant Site New Plymouth - Enabling Work 2014

Envirotanks
       
     
Envirotanks

Envirotanks Seismic Restraints NZ Wide 2013

Kapuni Stream Raw Water intake for Hawera
       
     
Kapuni Stream Raw Water intake for Hawera

Stream diverted through new intake structure November 2009. Kapuni Stream Raw Water intake for Hawera for the South Taranaki District Council. Feasibility, Design, Construction. South Taranaki 2006-2009.

Faull Farms
       
     
Faull Farms

Faull Farms 4.0m x 3.5m Underpass Tikorangi 2011

Lower Kohuratahi Suspension Bridge Conservation
       
     
Lower Kohuratahi Suspension Bridge Conservation

Lower Kohuratahi Suspension Bridge Conservation 2008. Stratford District. Part of current engineering services contract.

Stock Underpass
       
     
Stock Underpass

Stock Underpass on Peat Subgrade North Taranaki, March 2012.

Bridge to Somewhere
       
     
Bridge to Somewhere

Tahunaroa Road - Bridge to Somewhere 2007. Part of bridge inspection contract with Stratford District Council 2006 to present.

Underwater Depot Retaining Wall
       
     
Underwater Depot Retaining Wall

New Plymouth Underwater Depot Moturoa - Retaining Wall 2014

Underwater Depot Retaining Wall
       
     
Underwater Depot Retaining Wall

New Plymouth Underwater Depot Moturoa - Retaining Wall 2014

Wills Road Subdivisions
       
     
Wills Road Subdivisions

Urban Subdivisions Wills Road New Plymouth - Design & Construction 2014 - 2016

Storm Damage Repairs
       
     
Storm Damage Repairs

Storm Damage Assessment & Repairs - Stratford District Council 2015 - 2016

Ahuroa Road Culvert Replacement - Stratford District
       
     
Ahuroa Road Culvert Replacement - Stratford District

Design and construction supervision as part of engineering services contract 2016

2015 Storm Damage Slip Repair - Junction Road Stratford District
       
     
2015 Storm Damage Slip Repair - Junction Road Stratford District

Mechanically stabilised earth and rock facing reconstruction of slip failure to reopen road.  Design and construction supervision  as part of engineering services contract 2016.

2015 Storm Damage Slip Repair - Junction Road Stratford District
       
     
2015 Storm Damage Slip Repair - Junction Road Stratford District

Mechanically stabilised earth and rock facing reconstruction of slip failure to reopen road.  Design and construction supervision  as part of engineering services contract 2016.