Cross Country Pipelines

  • 5 new condensate and natural gas pipelines
  • Hand auger and machine borehole soil testing and slope stability analysis
  • Collaboration with Geotechnical Engineers
  • Construction monitoring and fill compaction testing
12.7Km of Pipe
343metres of Horizontal Direction Drilling
3 Stream Crossings
Website by