- Replacement of the existing corroded ‘Aluflo’
culvert
- Sizing of the culvert, detailed design and
drawings by Red Jacket
- Collaboration with the Taranaki Regional Council
(TRC) to adhere with Resource Consent requirements
- Construction monitoring of the installation with
a PS4 on completion
1800mm
Diameter
11.4m3/s
Capacity
37.5Metres
Long