- New two-storey residential building
- Steel roof structure, suspended concrete floors, concrete deck, block walls, retaining walls and foundations designed and drawn by Red Jacket
- Soakage pit designed by Red Jacket for onsite disposal of Stormwater
- Lift foundations and bracing design by Red Jacket
28
Drawings
23
Pre-Cast Floor Slabs
85
Hours