Subdivision Access Bridge

  • Pre-cast concrete double T-Beams rated to Class 1 loadings
  • Single lane access to a new residential sub-division
  • Soil testing, stream flow analysis, erosion control, design and detailed drawings completed by Red Jacket
  • Close liaison with developer and contractor to see the job through to complete
  • Construction monitoring and PS4 certification on completion to the requirements of NPDC
10.9metres Long
10 Piles
14270Kg Beams
Website by