MHW-G Well Site Development

  • 3.3ha Wellsite
  • Analysis of existing earthworks including strength testing and slope stability analysis
  • Expert Geotechnical involvement in conjunction with Tonkin and Taylor
  • Daily construction monitoring and PS4 certification
  • Pavement design and technical design reviews
  • 3km long pipelines and production station tie in works
  • On-going settlement monitoring and analysis
11 Machine Boreholes
14 CPT Tests
450Tonne Drilling Rig